Proposed Bond Projects - $80M

Called on August 19, 2024


Tarkington Early Childhood School

Year Built 1957 
Addition 1974
Approx. Square Footage

Functional Capacity
91,200 SF
Gym - 8,000 SF
419
Grades Served PreK-K
Current Enrollment 199
Building Levels 1

Bond Projects Include:

  • Roof Leak Repairs

  • Interior Painting

  • Flooring Upgrades

  • Energy Efficient LED Lighting and Controls

  • New Ceiling Tiles

  • Plumbing Upgrades

  • Restroom Upgrades

  • Gym Upgrades

  • HVAC Upgrades (Scope TBD)

  • Replace Interior Signage to meet ADA requirements

  • Upgrade Door Hardware to meet ADA requirements

  • Repairs of unknown issues

* - Indicates projects at this location not included in the above price.

*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")

 

Tarkington Elementary School

Year Built 1971
Addition - 1992
Approx. Square Footage
Functional Capacity
48,750 SF
775
Grades Served 1-5
Current Enrollment 741
Building Levels 1

*Based on demographic studies, we are projected to outgrow the current capacity of our elementary campus (Site #1). The plan is to move all of the students into the new elementary campus (Site #2), which will allow to us address future growth at Site #1.

Bond Projects Include:

  • Major Interior Renovations:

    • New lighting

    • New ceiling tile and grid

    • New flooring

    • Repainting all interiors

    • Secure entrance

    • Repairs

* - Indicates projects at this location not included in the above price.

*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")

 


Elementary #2 New Location/New Building 900 Student Capacity Approximately 110,600 SF

 



Tarkington Middle School 

Year Built 1974 
Approx. Square Footage
Functional Capacity 
122,150 SF
495 
Grades Served 6-8
Current Enrollment 418
Building Levels 1

Bond Projects Include:

  • Roof Leak Repairs

  • Cafeteria & Kitchen Renovation (increase core space)

  • New Vestibule to Meet ADA & Security Requirements

  • New Main Entrance Canopy

  • Science Lab Renovations

  • Flooring Upgrades throughout to address moisture issues

  • Covered Walkways 

  • Energy Efficient LED Lighting

  • Telescoping Bleachers in Gym

  • New Ceiling Tiles

  • Replacement of Interior Signage to meet ADA requirements

  • HVAC Upgrades (Scope TBD)

  • Repairs of any unknown issues

  • Interior Repainting


* - Indicates projects at this location not included in the above price.

*Band Hall Renovation & Addition and Auditorium Renovation (see below "Band/Auditorium Expansion & Renovations")

*Security Upgrades (see below "Safety & Security")


Tarkington High School

Year Built 2005
Approx. Square Footage
Functional Capacity
116,340 SF
545
Grades Served 9-12
Current Enrollment 555
Building Levels 2

Bond Projects Include:

  • Career & Technical Education Wing Addition

  • Additional classrooms 

  • Ag Shop Addition and Renovation

  • Fencing/Gates for Ag Shop

  • Science Labs Renovations (Fume hoods, flooring)

  • Energy Efficient LED Lighting and Controls Per Energy Code

  • Roof Leak Repair

  • Replace Interior Signage to meet ADA requirements

  • HVAC Upgrades (not in previous bond scope)

* - Indicates projects at this location not included in the above price.

*Band Hall Renovation (see below "Band/Auditorium Expansion & Renovations")

*Security Upgrades (see below "Safety & Security")


District Renovations

  • Utility Upgrades
  • Upgrades Parking Lot Lighting
  • Campus Marquees
  • Mechanical Upgrades & Repairs
  • Electrical Upgrades & Repairs
  • Plumbing Upgrades & Repairs
  • Wastewater Management Plant (1974)

Band Hall and Auditorium Expansion & Renovations

  • HS Band Hall Renovations, Upgrades & Expansion:
    • Increased rehearsal space
    • Practice rooms
    • Additional storage space for instruments and equipment
  • MS Band Hall Renovations & Upgrades:
    • Soundproofing
    • New carpet
  • MS Auditorium Renovations & Upgrades:
    • Upgraded sound system
    • Upgraded lighting
    • Stage repairs

Safety & Security Enhancements

  • Upgrades to Security Vestibules at Every Campus:
    • Tarkington High School
    • Tarkington Middle School
    • Tarkington Early Childhood
  • Entry Access Hardware Upgrades

 


General & Administrative Costs:

  • Boundary & topographic surveying
  • Soil reports and geotechnical engineering
  • Materials testing
  • Inspections and code reviews required by the state
  • Design fees: 
    • Plumbing engineering
    • Electrical engineering
    • Architectural services
    • Civil engineering
    • Structural engineering
    • Mechanical engineering
  • Interior design

The proposed projects construction costs by McKinley-Golden Associates are estimated to be approximately $76.5M on the high end.  The November 2024 bond was called on August 19, 2024 in the amount of $80m.  The primary reason for the difference between that amount and the total bond amount is that these are construction cost projections only and do not include funds to cover general and administrative costs for construction.