Proposed Bond Projects - $80M
Called on August 19, 2024
Tarkington Early Childhood School
Year Built | 1957 Addition 1974 |
---|---|
Approx. Square Footage Functional Capacity |
91,200 SF Gym - 8,000 SF 419 |
Grades Served | PreK-K |
Current Enrollment | 199 |
Building Levels | 1 |
Bond Projects Include:
-
Roof Leak Repairs
-
Interior Painting
-
Flooring Upgrades
-
Energy Efficient LED Lighting and Controls
-
New Ceiling Tiles
-
Plumbing Upgrades
-
Restroom Upgrades
-
Gym Upgrades
-
HVAC Upgrades (Scope TBD)
-
Replace Interior Signage to meet ADA requirements
-
Upgrade Door Hardware to meet ADA requirements
-
Repairs of unknown issues
* - Indicates projects at this location not included in the above price.
*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")
Tarkington Elementary School
Year Built | 1971 Addition - 1992 |
---|---|
Approx. Square Footage Functional Capacity |
48,750 SF 775 |
Grades Served | 1-5 |
Current Enrollment | 741 |
Building Levels | 1 |
*Based on demographic studies, we are projected to outgrow the current capacity of our elementary campus (Site #1). The plan is to move all of the students into the new elementary campus (Site #2), which will allow to us address future growth at Site #1.
Bond Projects Include:
-
Major Interior Renovations:
-
New lighting
-
New ceiling tile and grid
-
New flooring
-
Repainting all interiors
-
Secure entrance
-
Repairs
-
* - Indicates projects at this location not included in the above price.
*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")
Tarkington Middle School
Year Built | 1974 |
---|---|
Approx. Square Footage Functional Capacity |
122,150 SF 495 |
Grades Served | 6-8 |
Current Enrollment | 418 |
Building Levels | 1 |
Bond Projects Include:
-
Roof Leak Repairs
-
Cafeteria & Kitchen Renovation (increase core space)
-
New Vestibule to Meet ADA & Security Requirements
-
New Main Entrance Canopy
-
Science Lab Renovations
-
Flooring Upgrades throughout to address moisture issues
-
Covered Walkways
-
Energy Efficient LED Lighting
-
Telescoping Bleachers in Gym
-
New Ceiling Tiles
-
Replacement of Interior Signage to meet ADA requirements
-
HVAC Upgrades (Scope TBD)
-
Repairs of any unknown issues
-
Interior Repainting
* - Indicates projects at this location not included in the above price.
*Band Hall Renovation & Addition and Auditorium Renovation (see below "Band/Auditorium Expansion & Renovations")
*Security Upgrades (see below "Safety & Security")
Tarkington High School
Year Built | 2005 |
---|---|
Approx. Square Footage Functional Capacity |
116,340 SF 545 |
Grades Served | 9-12 |
Current Enrollment | 555 |
Building Levels | 2 |
Bond Projects Include:
-
Career & Technical Education Wing Addition
-
Additional classrooms
-
Ag Shop Addition and Renovation
-
Fencing/Gates for Ag Shop
-
Science Labs Renovations (Fume hoods, flooring)
-
Energy Efficient LED Lighting and Controls Per Energy Code
-
Roof Leak Repair
-
Replace Interior Signage to meet ADA requirements
-
HVAC Upgrades (not in previous bond scope)
* - Indicates projects at this location not included in the above price.
*Band Hall Renovation (see below "Band/Auditorium Expansion & Renovations")
*Security Upgrades (see below "Safety & Security")
District Renovations
- Utility Upgrades
- Upgrades Parking Lot Lighting
- Campus Marquees
- Mechanical Upgrades & Repairs
- Electrical Upgrades & Repairs
- Plumbing Upgrades & Repairs
- Wastewater Management Plant (1974)
Band Hall and Auditorium Expansion & Renovations
- HS Band Hall Renovations, Upgrades & Expansion:
- Increased rehearsal space
- Practice rooms
- Additional storage space for instruments and equipment
- MS Band Hall Renovations & Upgrades:
- Soundproofing
- New carpet
- MS Auditorium Renovations & Upgrades:
- Upgraded sound system
- Upgraded lighting
- Stage repairs
Safety & Security Enhancements
- Upgrades to Security Vestibules at Every Campus:
- Tarkington High School
- Tarkington Middle School
- Tarkington Early Childhood
- Entry Access Hardware Upgrades
General & Administrative Costs:
- Boundary & topographic surveying
- Soil reports and geotechnical engineering
- Materials testing
- Inspections and code reviews required by the state
- Design fees:
- Plumbing engineering
- Electrical engineering
- Architectural services
- Civil engineering
- Structural engineering
- Mechanical engineering
- Interior design