The estimated costs of the currently included projects in Proposition A range from 47.6 - 62.5 million. These are the projections presented in the Board Meeting on January 27, 2025.
Tarkington Early Childhood School
Year Built | 1957 Addition 1974 |
---|---|
Approx. Square Footage Functional Capacity |
91,200 SF Gym - 8,000 SF 419 |
Grades Served | PreK-K |
Current Enrollment | 199 |
Building Levels | 1 |
Bond Projects Include:
- Roof leak repairs
- Interior painting
- Flooring upgrades
- Energy efficient LED lighting and controls
- New ceiling tiles
- Plumbing upgrades
- Restroom upgrades
- Gym upgrades
- HVAC upgrades (scope TBD)
- Replace interior signage to meet ADA requirements
- Upgrades to door hardware to meet ADA requirements
- Repairs of any unknown issues
* Indicates projects at this location not included in the above price.
*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")
Tarkington Elementary School
Year Built | 1971 Addition - 1992 |
---|---|
Approx. Square Footage Functional Capacity |
48,750 SF 775 |
Grades Served | 1-5 |
Current Enrollment | 741 |
Building Levels | 1 |
*Based on demographic studies, we are projected to outgrow the current capacity of our elementary campus (Site #1). The plan is to move all of the students into the new elementary campus (Site #2), which will allow to us address future growth at Site #1.
Bond Projects Include:
- Functional capacity of 775 students
- Major interior renovations:
- New lighting
- New ceiling tile and grid
- New flooring
- Repainting all interiors
- Secure entrance
- Repairs
* -Indicates projects at this location not included in the above price.
*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")
Tarkington Middle School
Year Built | 1974 |
---|---|
Approx. Square Footage Functional Capacity |
122,150 SF 495 |
Grades Served | 6-8 |
Current Enrollment | 418 |
Building Levels | 1 |
Bond Projects Include:
- Roof leak repairs
- Cafeteria and kitchen renovation (increase core space)
- New vestibule to meet ADA and security requirements
- New main entrance canopy
- Science lab renovations
- Flooring upgrades throughout to address moisture issues
- Covered walkways
- Energy efficient LED Lighting
- Telescoping bleachers in gym
- New ceiling tiles
- Replacement of interior signage to meet ADA requirements
- HVAC upgrades (scope TBD)
- Repairs of any unknown issues
- Interior repainting
* - Indicates projects at this location not included in the above price.
*Band Hall Renovation & Addition and Auditorium Renovation (see below "Band/Auditorium Expansion & Renovations")
*Security Upgrades (see below "Safety & Security")
Tarkington High School
Year Built | 2005 |
---|---|
Approx. Square Footage Functional Capacity |
116,340 SF 545 |
Grades Served | 9-12 |
Current Enrollment | 555 |
Building Levels | 2 |
Bond Projects Include:
- Career and Technical Education wing addition
- Additional classrooms
- Ag shop addition and renovation
- Additional fencing/gates for Ag Shop
- Science labs renovations (fume hoods, flooring)
- Energy efficient LED lighting and controls per energy code
- Roof leak repair
- Replace interior signage to meet ADA requirements
- HVAC upgrades
* Indicates projects at this location not included in the above price.
*Band Hall Renovation (see below "Band/Auditorium Expansion & Renovations")
*Security Upgrades (see below "Safety & Security")
Band Hall, Auditorium Expansion & Renovations
- HS Band Hall renovations, upgrades and expansion:
- Increased rehearsal space
- Practice rooms
- Additional storage space for instruments and equipment
- MS Band Hall renovations and upgrades:
- Soundproofing
- New carpet
- MS Auditorium renovations and upgrades:
- Upgrades to sound system
- Upgrades to lighting
- Stage repairs
District Renovations
- Buses
- Purchase of land
- Wastewater Management Plant (1974)
Safety & Security Enhancements
- Upgrades to security vestibules
- Tarkington Elementary School
- Tarkington Early Childhood School
- Tarkington Middle School
- Tarkington High School
- Entry access hardware upgrades
New Elementary School
Construction to accommodate the District’s growing student population.
-
Construction, acquisition, and equipment of new elementary school
-
900 student capacity
-
Approximately 110,000 SF
General & Administrative Costs
The proposed projects construction costs by McKinley-Golden Associates are estimated. The total bond amount reflects total project cost projections which include funds to cover general and administrative costs for construction.
General & Administrative Costs:
- Boundary & topographic surveying
- Soil reports and geotechnical engineering
- Materials testing
- Inspections and code reviews required by the state
- Design fees:
- Plumbing engineering
- Electrical engineering
- Architectural services
- Civil engineering
- Structural engineering
- Mechanical engineering
- Interior design