Skip To Main Content

Proposed Bond Projects - $59M


New Elementary $36.6M
Elementary #2 New Location/New Building 900 Student Capacity Approximately 110,600 SF

 


Middle School Additions & District Renovations $12.6M

Tarkington Middle School - $7M

Year Built 1974 
Approx. Square Footage
Functional Capacity 
122,150 SF
495 
Grades Served 6-8
Current Enrollment 416
Building Levels 1

Bond Projects Include:

  • Interior Repainting

  • Roof Leak Repairs

  • Cafeteria & Kitchen Renovation (increase core space)

  • Updated Vestibule to Meet ADA Requirements

  • Main Entrance Canopy

  • Science Lab Renovations

  • Flooring

  • Covered Walkways 

  • Energy Efficient LED Lighting

  • Telescoping Bleachers in Gym

  • New Ceiling Tiles

  • Upgraded Interior Signage to meet ADA requirements

  • HVAC Upgrades


* - Indicates projects at this location not included in the above price.

*Band Hall Renovation & Addition and Auditorium Renovation (see below "Band/Auditorium Expansion & Renovations")

*Security Upgrades (see below "Safety & Security")

District Renovations - $5.6M

  • Utility Upgrades
  • Upgraded Parking Lot Lighting
  • Campus Marquees
  • Mechanical Upgrades & Repairs
  • Electrical Upgrades & Repairs
  • Plumbing Upgrades & Repairs
  • Wastewater Management Plant

High School / CTE Expansion & Ag renovations $5.3M

Tarkington High School

Year Built 2005
Approx. Square Footage
Functional Capacity
116,340 SF
545
Grades Served 9-12
Current Enrollment 503
Building Levels 2

Bond Projects Include:

  • Career & Technical Education Wing Addition

  • Additional classrooms 

  • Ag Shop Addition and Renovation

  • Fencing/Gates for Ag Shop

  • Science Labs Upgrades

  • Energy Efficient LED Lighting and Controls Per Energy Code

  • Roof Leak Repair

  • Upgraded Interior Signage to meet ADA requirements
     

* - Indicates projects at this location not included in the above price.

*Band Hall Renovation (see below "Band/Auditorium Expansion & Renovations")

*Security Upgrades (see below "Safety & Security")


Early Childhood Renovations $2.8M

Tarkington Early Childhood School

Year Built 1957 - Addition 1974
Gym - 1974
Approx. Square Footage

Functional Capacity
91,200 SF
Gym - 8,000 SF
419
Grades Served PreK-K
Current Enrollment 191
Building Levels 1

Bond Projects Include:

  • Roof Leak Repairs

  • Interior Painting

  • Flooring

  • Energy Efficient LED Lighting and Controls

  • New Ceiling Tiles

  • Plumbing Upgrades

  • Restroom Upgrades

  • Gym Upgrades

  • HVAC Upgrades

  • Upgraded Interior Signage to meet ADA requirements

  • Upgraded Door Hardware to meet ADA requirements

  • Repairs
     

* - Indicates projects at this location not included in the above price.

*New Security Vestibule to Create Prominent Entrance (see below "Safety & Security")


Band / Auditorium Expansion & Renovations $1.1M

Band/Auditorium Expansion & Renovations

  • HS Band Hall Renovations, Upgrades & Expansion to include:
    • Increased rehearsal space
    • Practice rooms
    • Additional storage space for instruments and equipment
  • MS Band Hall Renovations & Upgrades to include:
    • Soundproofing
    • New carpet
  • MS Auditorium Renovations & Upgrades to include:
    • Upgraded sound system
    • Upgraded lighting
    • Stage repairs

Safety & Security $600,000

Safety & Security 

  • Upgraded Security Vestibules at Every Campus:
    • Tarkington High School
    • Tarkington Middle School
    • Tarkington Early Childhood
  • Entry Access Hardware Upgrades

 


*Future Project - Not in the Current Bond Package

Tarkington Elementary School

Year Built 1971
Addition - 1992
Approx. Square Footage
Functional Capacity
48,750 SF
775
Grades Served 1-5
Current Enrollment 771
Building Levels 1

*Based on demographic studies, we are projected to outgrow the current capacity of our elementary campus (Site #1). The plan is to move all of the students into the new elementary campus (Site #2), which will allow to us address future growth at Site #1.